PRODUCTION LEAD TIMESStock 2 weeks min//Custom 6 weeks min//Canopies 6 weeks min
Support documents

EVO2 · TECHNICAL GUIDE

Packing the Secondary Riser Covers

Follow these steps to correctly route, position and secure the risers with the new secondary riser covers on the EVO2 system. Proper packing ensures clean riser presentation, reliable deployment and optimal aesthetics.

New secondary riser coversRevision 1 · November 24, 2025
01

Route & Position the Risers

  1. Place the risers on top of each other, routing them underneath the main riser cover.

  2. Continue routing until you reach the secondary riser cover.

Steps 1–2 · route the risers beneath the main riser cover.
Steps 1–2 · route the risers beneath the main riser cover.
  1. Split the risers so they run parallel to one another.

  2. Position the rear riser at the bottom of the sidewall, ensuring the toggle faces the reserve tray.

  3. Make sure the rear riser lies completely flat before proceeding.

Steps 3–5 · position the rear riser flat, with its toggle facing the reserve tray.
Steps 3–5 · position the rear riser flat, with its toggle facing the reserve tray.
  1. Place the front riser parallel to the rear riser, underneath the secondary riser cover, with the dive loops facing the reserve tray. Ensure it is as flat as possible.

Step 6 · front riser parallel to the rear riser.
Step 6 · front riser parallel to the rear riser.
02

Close the Riser Covers

  1. Close the secondary riser cover, making sure it is fully stretched and completely covers both the front and rear risers. Position the binding tape of the secondary riser cover as close as possible to the bottom of the container (the backpack).

Step 7 · stretch the secondary cover over both risers.
Step 7 · stretch the secondary cover over both risers.
  1. Hold the secondary riser cover in place with the sidewall, then close the main riser cover. Insert the pointed tip first. Ensure the magnets align properly and confirm that the secondary riser cover remains fully stretched to maintain optimal aesthetics and proper memory in your EVO2.

Step 8 · close the main riser cover; inset shows the cover detail.
Step 8 · close the main riser cover; inset shows the cover detail.
  1. Verify riser alignment and riser ramp routing. Make sure the risers run parallel all the way to the riser ramps. Ensure the soft links and canopy lines follow the riser ramps to prevent any canopy lines from being routed to the bottom of the reserve tray.

Step 9 · check parallel risers and routing along the riser ramps.
Step 9 · check parallel risers and routing along the riser ramps.
03

Complete & Check the Pack Job

  1. Repeat the entire process on the opposite side to complete the secondary and main riser cover packing setup.

  2. Place the main deployment bag into the main tray and close the container, completing the pack job.

  3. Verify secondary riser cover alignment. After closing the main tray, check that the secondary riser covers are still correctly positioned to ensure proper coverage and maintain clean aesthetics.

Completed EVO2 riser-cover arrangement.
Completed EVO2 riser-cover arrangement.

If you have any questions, please contact Firebird. Our master rigger will be happy to assist you.

YOUR SELECTION

Your Cart (0)

Start with What You Need.

Your selections will stay in this browser.

Explore Spare Parts